Case ref: MLA/2015/00405
Licence ref: L/2016/00004/1

Case summary

Main content

Project description

Disposal of Glasson Dock Maintenance Dredging
Maintenance dredging of silt in the enclosed dock at Glasson, using Grab and Hopper Barge or Grab Hopper Dredger, and disposal of dredged silt at the existing disposal site in the Lune Estuary, to maintain a navigable depth in the enclosed dock.
Dredging operations take place whenever high water occurs during normal working (daylight) hours, which facilitates disposal of the dredgings at or around high water at the designated dumpsite behind River Lune No 14 Buoy, and when other operational requirements allow

Other information

Applicant details

Mrs   Helen Loxam / 01524 751724 / helen.loxam@lancasterport.org
LANCASTER PORT COMMISSION / WEST QUAY GLASSON DOCK LANCASTER / LA2 0DB
23-SEP-2015
20-OCT-2015
08-JAN-2016
Completed
(Discharging conditions)