Case ref: MLA/2015/00077
Licence ref: L/2015/00281/1
Case summary
Case summary
View application and documents
Public representation
Associated applications and consents
Main content
Project description
Project title
Barrow Offshore Wind Farm (OWF) Export Cable Repair and Remediation
Project background
The Barrow OWF is located approximately 8 km from the Cumbrian coast, in north-west England. It consists of 30 x 3MW turbines, giving a total project capacity of 90 MW. There is a single, 26km export cable from the site which makes landfall at Heysham and an offshore substation. Offshore construction of the project started in May 2005, with the site officially opened in September 2006.
Transmission Capital Barrow OFTO Ltd was awarded a transmission licence and took ownership of the OFTO assets (offshore substation, export cable, onshore cable and onshore substation) on 27 September 2011.
See attached document (TCP Barrow Cable Supporting Env Info 261114 v0.5) for full details
Programme of works
The proposed works include;
• 5 x cable repair events, with associated jacking-up; and
• 10 x cable remediation events (via jetting).
Cable repair events are required when a cable fault or failure is detected by the Barrow OWF protection system. This section of the export cable will be recovered following de-burial operations where required. A new section of cable will be jointed to the cut, exposed end of the existing export cable and re-burial will subsequently be carried out via jetting.
Cable remediation events are required when lengths of the export cable have become exposed due to natural sediment transport processes. Cable re-burial will be carried out via jetting. These events will most likely be subject to pre- and post-cable inspection surveys.
See attached document (TCP Barrow Cable Supporting Env Info 261114 v0.5) for full details.
Other information
Applicant details
Mr Mike Lee / +44 20 3668 6688 / mike.lee@transmissioninvestment.com
TC BARROW OFTO LIMITED / Sixth Floor, 135 Cannon St, London / EC4N 5BP
Date application submitted
16-FEB-2015
Date application validated
18-FEB-2015
Date initial decision made
14-AUG-2015
Status
Completed