Project description
Project title
Folkestone Warren - Clearance of fallen chalk on walkway
Project description
Network Rail owns a section of land between Folkestone and Dover along the Folkestone Warren. The site is used by the general public and Network Rail is required to ensure the site is kept as safe as possible. Large volumes of chalk that have fallen from the cliffs in the area have breached the existing catch fence and have come to rest on the public walkway. Network Rail is looking to clear approximately 70 cubic metres of material from behind the catch fence and walkway and to dispose of it into a large void at the end of the sea wall (see attached document for images).
Other information
Applicant details
Mr Michael Evans / 07718003673 / michael.evans4@networkrail.co.uk
NETWORK RAIL LIMITED / Civils Asset Management, Suite 1, Floor 2, Waterloo Station, London, SE18SW / SE1 8SW
Date application submitted
04-JUN-2013
Date application validated
Not validated
Date initial decision made
01-AUG-2013
Status
Completed